Wine-growing Mrva&Stanko - I. stage
Data Of Project
Site of building:
Trnava
Investor:
Víno Mrva&Stanko, a.s.
Architect:
Ing. arch. Marián Šulík
Structural engineer:
Doc. Ing. Štefan Hajdu, PhD.
Ing. Zoltán Szabad, PhD.
Structure:
concrete footings
reinforced concrete frames
Stage of project:
for realization
Date:
January 2003
Soure: